1. Why a life cycle, and why more than one

A program development life cycle splits the development of a program into stages. This makes the work easier to manage, plan and cost.

It also gives clear deliverables at the end of each stage.

No single life cycle suits every program. The choice depends on the approach needed to produce the program: for example, whether the requirements are agreed at the start or are likely to change, and whether prototypes are needed at an early stage. The life cycles to know are waterfall, iterative and rapid application development (RAD).

Examiner insight

“Sometimes the answer was too vague or just a reuse of the reference to steps given in the question.”

Worked example 13 marks

Several companies are developing websites to market a new type of games console. The company that is first to create a website that can demonstrate the interactive features of the games console will have an advantage over the others. The requirements for the website are likely to change as more information about the features of the console are made available.

One company has decided to develop their website using a program development life cycle based on the waterfall model.

Give two reasons why this may not be the most appropriate model to use in this case. Identify a more appropriate program development life cycle model for this scenario.

  1. 1

    Reason 1: no working software until late in the life cycle, so slower to market than competitors [1]

  2. 2

    Reason 2: more difficult / slower to cope with changes to the requirements [1]

  3. 3

    More appropriate model: iterative / Rapid Application Development (RAD) [1]

2. The waterfall life cycle

In the waterfall life cycle the stages follow an agreed sequence. The next stage does not start until the current stage is successfully completed.

All requirements are identified before coding. This makes the budget and the timeline more predictable.

The drawback is that late changes cannot be accommodated. There is no working software until late in the life cycle.

Worked example 12 marks

The waterfall model of the program development life cycle has downward and upward arrows between its stages.

Explain the meaning of the downward and upward arrows.

  1. 1

    Downward arrows: the result from one stage is passed to the next stage as its input [1]

  2. 2

    Upward arrows: more work is required at a previous stage to complete the current stage [1]

3. Iterative and rapid application development

Iterative development and Rapid Application Development (RAD) suit a client who is unclear about all the details of the solution, or whose requirements will change. A working model / prototype is provided at an early stage for the client to approve or review.

RAD works in small incremental releases, each adding functionality. Modules are developed in parallel, with minimal detailed planning, and the client is involved during development.

The drawbacks are that it is difficult to estimate cost and time to complete the project, documentation is often omitted, and the client may not be available throughout.

Examiner insight

“Many answers were too vague to gain credit. The most common correct answer mentioned development of prototypes. Few answers mentioned the importance of client involvement.” “The drawbacks of RAD were less well known than the benefits.”

Worked example 14 marks

The program will be developed using the Rapid Application Development (RAD) life cycle.

State one principle of this life cycle.

Give two benefits and one drawback of its use compared to the waterfall life cycle.

  1. 1

    Principle: prototypes are developed / the client is involved during development [1]

  2. 2

    Benefit 1: quicker development possible, as multiple areas can be worked on at the same time [1]

  3. 3

    Benefit 2: a prototype is produced at an early stage [1]

  4. 4

    Drawback: difficult to estimate cost / time to complete the project [1]

4. Analysis stage

In the analysis stage the developer studies the current system in detail and discusses the requirements with the client.

Activities include interviews with managers and staff, a survey of employees or customers, and observing the current system in use.

The stage produces the requirements specification. It also decides which program development life cycle will be used.

Examiner insight

“Examples of incorrect documents include ‘initial plan’, ‘flowchart’ and ‘trace table’.”

Worked example 13 marks

A business operates five call centres. The software currently in use in each call centre is to be replaced; a new system will be developed by a software company.

The analysis stage included a feasibility study.

State three other activities carried out during the analysis stage.

  1. 1

    Discussion / interviews with managers [1]

  2. 2

    Observe the current system in use [1]

  3. 3

    Produce the requirements specification [1]

5. Design stage

In the design stage the solution is planned before any programming is started. Records and file structures are defined, and an identifier table is produced.

The program structure is specified, for example with a structure chart. Algorithms are written as flowcharts or pseudocode.

The design also covers the user interface, the choice of programming language and the test plan.

Worked example 13 marks

A software company is working on a project to develop a website for a school.

The website project has progressed to the design stage.

State three activities that will take place during the design stage of the program development life cycle.

  1. 1

    Decisions on data structures [1]

  2. 2

    Decisions on algorithms (flowcharts / pseudocode) [1]

  3. 3

    Design of the user interface / web-page layout [1]

6. Coding, testing and maintenance

In the coding stage the algorithm is implemented in a programming language. A compiler is used and syntax errors can occur.

In the testing stage the program is checked, for example by a dry run with a trace table. Testing in-house is alpha testing. Beta testing is carried out by a small group of potential users. Acceptance testing is carried out by the customer on their own hardware.

In the maintenance stage a program that has been released is modified. Corrective maintenance fixes bugs reported after release. Adaptive maintenance responds to a change in requirements, new technology or a change in relevant legislation. Perfective maintenance is a third type.

Examiner insight

“Answers that simply referred to the program being ‘tested’, were not sufficient, as this was given in the question.” “Some answers tried to expand on the question scenario of ‘new hardware’ and this did not gain credit.”

Worked example 15 marks

A software developer follows a program development life cycle. The life cycle divides the development process into various stages.

The following table lists some development activities.

Complete the table by writing the name of the life cycle stage for each activity.

ActivityName of life cycle stage
The walkthrough method is used.
An algorithm is implemented in a programming language.
The client is interviewed about problems with the current system.
The program is modified to run on new hardware.
Records and file structures are defined.
  1. 1

    Walkthrough method: Testing [1]

  2. 2

    Algorithm implemented in a programming language: Coding [1]

  3. 3

    Client interviewed about problems: Analysis [1]

  4. 4

    Program modified to run on new hardware: Maintenance [1]

  5. 5

    Records and file structures defined: Design [1]

Recap

  • A life cycle splits development into stages: analysis, design, coding, testing, maintenance.
  • Different programs need different life cycles: choose by whether requirements are fixed or likely to change.
  • Waterfall: the next stage starts only when the current one is complete. Predictable, but late changes cannot be accommodated.
  • Iterative and RAD: early prototypes, small incremental releases, client involved. Cost and time are hard to estimate.
  • Analysis produces the requirements specification. Design produces structure charts, algorithms and the identifier table.
  • Coding writes the program. Testing includes alpha, beta and acceptance testing. Maintenance is corrective, adaptive or perfective.

End-of-chapter exercise

Test yourself on the whole chapter. Work through these before moving on.

  1. Syntax errors can occur in one stage of the program development life cycle. Name the stage.1 mark
    Answer
    1. Coding.

    Trap: Testing is where errors are found, but the syntax errors occur while the program is being coded.

  2. State two benefits of using a program development life cycle.2 marks
    Answer
    1. Easier to manage, plan and cost.
    2. Clear deliverables are produced at the end of each stage.

    Trap: ‘It has stages’ only repeats the question; give the benefit that follows from the stages.

  3. A programmer interviews the owner of a bakery about the problems with the shop's current ordering system. Name the life cycle stage and give one document produced in it.2 marks
    Answer
    1. Stage: analysis.
    2. Document: requirements specification.

    Trap: A flowchart or trace table is not an analysis document.

  4. Name the life cycle stage for each activity: a compiler is used; a structure chart is produced; the program is changed to run on new hardware after release; a dry run is carried out.4 marks
    Answer
    1. A compiler is used: coding.
    2. A structure chart is produced: design.
    3. Changed to run on new hardware after release: maintenance.
    4. A dry run: testing.

    Trap: Changing a program is not always coding; once it has been released it is maintenance.

  5. A project uses the waterfall life cycle. State two features of this life cycle.2 marks
    Answer
    1. The next stage does not start until the current stage is successfully completed.
    2. All requirements are identified before coding, so the budget and timeline are more predictable.

    Trap: Do not say stages happen ‘one after another’ and stop: give the rule that makes it waterfall.

  6. A museum wants an app for visitors. The curator has only a rough idea of how it should look and wants to see an early version. Identify a suitable life cycle and give two reasons for your choice.3 marks
    Answer
    1. Iterative / rapid application development (RAD).
    2. It provides a prototype at an early stage for the curator to review.
    3. The client is involved during development, so unclear requirements can be changed.

    Trap: Waterfall needs every requirement agreed before coding, so it cannot suit a client who is unclear.

  7. A team is planning a booking program. The activities are: A, interview the staff; B, draw a structure chart; C, write the identifier table; D, carry out a dry run; E, design the input screen; F, fix a bug reported by a customer. State the three activities that belong to the design stage.3 marks
    Answer
    1. B: a structure chart specifies the program structure.
    2. C: the identifier table is produced in design.
    3. E: the user interface is designed in this stage.

    Trap: A dry run is testing, interviewing is analysis and fixing a reported bug is maintenance.

  8. Give two benefits and two drawbacks of using RAD compared with the waterfall life cycle.4 marks
    Answer
    1. Benefit: quicker development, as several areas can be worked on at the same time.
    2. Benefit: a prototype is produced at an early stage.
    3. Drawback: it is difficult to estimate the cost and time to complete the project.
    4. Drawback: documentation is often omitted, or the client may not be available throughout.

    Trap: ‘Late changes cannot be accommodated’ is a drawback of waterfall, not RAD.

  9. A bus company is replacing the ticket software on its 40 buses. Five events happen in order. (1) The developer watches drivers using the current software. (2) The developer's own staff test the new software before it leaves the developer. (3) The software is installed on 3 buses and the drivers use it for a month. (4) The bus company tests every program on its own ticket machines and then approves the system. (5) After release, drivers report that some tickets print the wrong date. Name the life cycle stage, type of testing or type of maintenance for each event. For event 3, also describe what the drivers do.6 marks
    Answer
    1. 1: analysis (observing the current system in use).
    2. 2: alpha testing.
    3. 3: beta testing.
    4. 3, description: a small group of potential users use it in the real world and feed back the problems they find.
    5. 4: acceptance testing.
    6. 5: corrective maintenance, because a bug has been reported after release.

    Trap: Describing beta testing as ‘the software is tested’ only repeats the question: say who tests it and that they feed back problems.

  10. A hospital needs an appointments system. Clinics will keep adding services, so the requirements will change, and the manager wants an early version quickly. A developer proposes the waterfall life cycle. After release, a new law requires the system to store the date of each patient's consent. (a) Give two reasons why waterfall is not the most appropriate life cycle. (b) Identify a more appropriate life cycle. (c) Name the type of maintenance now needed and give a reason. (d) State one document produced in the analysis stage.6 marks
    Answer
    1. (a)
    2. No working software until late in the life cycle, so the manager cannot have an early version quickly.
    3. All requirements must be identified before coding and late changes cannot be accommodated, so new clinic services are slow to include.
    4. (b)
    5. Iterative / rapid application development (RAD).
    6. (c)
    7. Adaptive maintenance, because of a change in relevant legislation.
    8. (d)
    9. Requirements specification.

    Trap: A reason like ‘waterfall is slow’ earns nothing: examiners reported that most answers could not give reasons tied to the context, here changing requirements and the need for an early version.

Say this, not that

Wording that loses the mark, against the wording the mark scheme credits.

Loses the markGets the mark
‘initial plan’, ‘flowchart’ or ‘trace table’ as a document from analysisrequirements specification
The life cycle splits the development into stages.Easier to manage / plan / cost, with clear deliverables at the end of each stage.
Beta testing: the program is tested.Testing carried out by a small group of potential users, who give feedback on problems.
The program needs to run on new hardware (when the question has already said so).The user requirements have changed, which also needs adaptive maintenance.

Frequently asked questions

What is a program development life cycle and why use one?
A program development life cycle splits the development of a program into stages, which makes the work easier to manage, plan and cost. It also gives clear deliverables at the end of each stage. No single life cycle suits every program. The choice depends on whether requirements are agreed at the start or are likely to change.
What is the waterfall life cycle and what are its drawbacks?
In the waterfall life cycle the next stage does not start until the current stage is successfully completed. All requirements are identified before coding, so the budget and timeline are more predictable. The drawbacks are that late changes cannot be accommodated and there is no working software until late in the life cycle.
When is iterative or rapid application development (RAD) more suitable than waterfall?
They suit a client who is unclear about all the details of the solution or whose requirements will change. A working model or prototype is provided at an early stage for the client to review. RAD works in small incremental releases, with modules developed in parallel and the client involved during development.
What do the analysis and design stages of a life cycle produce?
Analysis studies the current system through interviews, surveys and observation, and produces the requirements specification. Design plans the solution before programming starts. It defines records and file structures, produces an identifier table and a structure chart, and specifies algorithms as flowcharts or pseudocode, along with the user interface and the test plan.
What are alpha, beta and acceptance testing?
Alpha testing is carried out in-house by the developer. Beta testing is carried out by a small group of potential users, who give feedback on problems. Acceptance testing is carried out by the customer on their own hardware. A dry run with a trace table is another form of testing.
What mistake do students make when explaining why waterfall is not the right life cycle?
They give a generic reason that is not tied to the scenario. Examiners reported that most answers could not give reasons tied to the context. Give reasons from the scenario, such as no working software until late in the life cycle, or late changes to requirements that cannot be accommodated.